Makino Aquatic Centre
Makino Aquatic Centre
Council Place, Feilding
Makino Aquatic Centre
Scope of works includes installing air conditioning, extract system & supply air system to keep the building at a comfortable temperature.
Fabric duct was used in this project due to the corrosive environment. Equipment installed includes new expansion vessels, hot water fan coil units, roof top fans, split system heat pumps, flexalen pipework and pipe insulation. Modify existing primary loop heating system, modify plate heat exchanger and install new.